Step 18. Install The New Handler I/O Cable; N5245 - Keysight Technologies N524 A Series Installation Note

2-port/4-port , pna-x upgrade kit
Table of Contents

Advertisement

Description of this Upgrade

Step 18. Install the New Handler I/O Cable

Step 18. Install the New Handler I/O Cable
Refer to your instrument Service Guide's section "Remove and Replace the A19
Test Set Motherboard" on www.keysight.com.
1. Remove the A19 TSMB and be careful to mark all of the cables before
2. Remove the old handler I/O cable and discard, it will not be reused.
3. Install the new I/O cable (8121-2919) using (x2) 0515-0372 screws.
4. Reinstall the A19 TSMB by reversing the procedure in the Service Guide's
Figure 14
Install the Handler I/O Cable (8121-2919 and 0515-0372 (x2))
44
removal (i.e., If your TSMB needs to be replaced ("N524063043"), discard
this older board.)
Torque to 9 lb-ins.
"Remove and Replace the A19 Test Set Motherboard" section.
Installation Note N5242-90023

Advertisement

Table of Contents
loading

Table of Contents