BRAKE CIRCUIT ABBREVIATIONS

AA
Automatic Apply Pressure
AF2
Accumulator, Front Brake
Supply Pressure to Brake Valve for
AF1
Front Brakes
AR2
Accumulator, Rear Brake
Supply Pressure to Brake Valve for
AR1
Rear Brakes
BF
Brake Pressure, Front
BL
Brake Lock Apply Pressure
BR
Brake Pressure, Rear
Cavity Plug, One Direction Flow -
CP1
No specific function in this application.
CV, CVR,
Check Valve
CVF
DSV
High Pressure Shuttle Valve
LS
Low Pressure Shuttle Valve
Pressure Tap Test Port
LAP1
Low Accumulator Pressure
Low Brake Pressure Switch
LAP2
N.C., 1850 ±75 psi (12.95 MPa)
NVF
Front Accumulator Manual Drain Valve
NVR
Rear Accumulator Manual Drain Valve
PK1
Park Brake Release Pressure
PK2
Park Brake Release Pressure
Park Brake Pressure Switch
PK3
N.C., 1250 psi (8.75 MPa)
Brake Lock Pressure Regulator
PR
2000 psi (13.8 MPa)
Automatic Apply Valve
PSV
1650 psi (11.55 MPa)
SP1
Supply Oil Inlet
SV1
Brake Lock Solenoid
SV2
Park Brake Solenoid
T1
Return To Tank
J04025

EQUIPMENT REQUIRED

Included on the last page of this module is a data sheet
to record the information observed during the hydraulic
brake system check-out procedure. The data sheet
can be removed, copied, and used during the check-
out procedure.
*
Steps indicated in this manner should be recorded
on the data sheet for reference.
The following equipment will be necessary to properly
check-out the hydraulic brake circuit:
• Hydraulic brake schematic, refer to Section "R"
this manual.
• Calibrated pressure gauges:
> One 0-5000 psi (0-34,475 kPa) range.
> Three 0-3000 psi (0-20,685 kPa) range.
• One PB6039 female quick disconnect and hose
long enough to reach from brake cabinet to the
inside of the operator's cab for each gauge.
• Accumulator charging kit (EB1759 or equiva-
lent) with gauges and dry nitrogen.
Brake Circuit Checkout
J4-3

Advertisement

Table of Contents
loading

Table of Contents