Engaging Rear Pto Shaft - Independent Revolutions - Zetor MAJOR HS Series Operator's Manual

Table of Contents

Advertisement

PTO shaft revolutions 540 and 1000 rpm shifting lever
The shifting of 540 or 1,000 rpm of the rear PTO shaft is performed with the lever (1) located outside the
cabin above the rear PTO shaft.
a -
540 rpm
b -
1,000 rpm
The shifting is performed when tractor is idling and the lever of switching of dependent and independent
revolutions of the rear PTO shaft drive is in the position (n).
The lever (1) shifted in the position (a) 540 rpm is indicated by the green backlight of the 540 (3) symbol on
the display of the instrument panel.
The lever (1) shifted in the position (b) 1,000 rpm is indicated by the green backlight of the 1000 (2) symbol
on the display of the instrument panel.
PTO shaft revolutions need to be selected depending on the prescribed revolutions from
aggregated machines.

Engaging rear PTO shaft - Independent revolutions

At independent revolutions of the rear PTO shaft the number of PTO shaft revolutions depends on the
number of engine revolutions.
With the engine running:
1. Select the number of revolutions of the PTO shaft.
2. The lever for activation of the PTO shaft drive must be moved to the position (b).
3. Activate the clutch switch of the rear PTO shaft on the panel on the right rear mudguard.
When the work with the PTO shaft is finished, move the lever of the PTO shaft drive to the position (n).
The number of revolutions of the independent PTO shaft see the Chapter Main technical parameters.
DRIVE OF AGRICULTURAL MACHINERY
MHS16N111
MHS16N112
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Major hs 80Major hs

Table of Contents