After work with front implements and in case of cooler clogging
After work with front implements:
- Check the connections of the external hydraulic circuit of
the control of the front three-point hitch for leaks
Clogging of the coolers:
- Release and slide the cooler to the left side of the tractor.
- Clean the front walls of the engine (gearbox, air-
conditioning condenser) cooler with compressed air (blow
air in the direction from the engine).
- Remove residual dirt from the space under the hood so
that it should not be suctioned again.
- release the screw (1) from the right side of the tractor
and tilt the oil cooler of the front PTO shaft
- clean the walls of the cooler with pressure air
Tyres and wheels
Check the air pressure in the front and rear tyres.
Depending on the character of work adjust the pressure to
the recommended value. Check and if necessary retighten
the bolts of the front and rear wheels.
Never drive with loose wheel bolts!
Short functional test
After starting the engine, check whether the engine
lubrication signal lamp and charging signal lamp went out.
Verify the function and tightness of hydraulic control
circuits.
PREVENTIVE DAILY MAINTENANCE
24
C113
NM15D022
NM13N086