3. How to Install
3.1.1. About How to Install
This chapter covers mechanical and electrical installations to and from power terminals and control card terminals.
Electrical installation of
options
3.1.2. How to Get Started
FC 300 AutomationDrive is designed to achieve a quick and EMC-correct installation by following the steps described below.
Read the safety instructions before installing the unit.
Mechanical Installation
•
Mechanical mounting
Electrical Installation
•
Connection to Mains and Protecting Earth
•
Motor connection and cables
•
Fuses and circuit breakers
•
Control terminals - cables
Quick setup
•
Local Control Panel, LCP
•
Automatic Motor Adaptation, AMA
•
Programming
Illustration 3.1: Diagram showing basic installation including mains,
motor, start/stop key, and potentiometer for speed adjustment.
is described in the relevant Operating Instructions and Design Guide.
MG.33.AB.02 - VLT is a registered Danfoss trademark
3. How to Install
3
13
Need help?
Do you have a question about the VLT AutomationDrive FC 300 and is the answer not in the manual?
Questions and answers