Rotax 912 iS Sport Operator's Manual page 41

Hide thumbs Also See for 912 iS Sport:
Table of Contents

Advertisement

Engine start
performance
Diagram
Effectivity: 912 i Series
Edition 2 / Rev. 0
Non-compliance can result in serious injuries or death!
Monitor operating limits. Limits must not be exceeded.
Good engine start behavior will be achieved when setting the
throttle at 50% (± 5%) during engine start. In the aircraft this
number approximately corresponds to a throttle lever travel of
1-2 cm.
NOTE
These numbers depend strongly on the design and the actua-
tion mechanism of the throttle leverage and will vary from air-
craft to aircraft.
Throttle must be reduced as required right after the engine start to
avoid unnecessary high engine rpm, while the engine is still cold.
For detailed information see following diagram.
Figure 3: Diagram
BRP-Rotax
m WARNING
ATTENTION
Page 3-9
January 01 2019

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 i series912 isc sport

Table of Contents