Operating Guide | VACON® NX Inverters FI4-FI8
Procedure
1. Check that the delivery agrees to the order, see
2. Before starting the commissioning, read carefully the safety instructions in
3. Before the mechanical installation, check the minimum clearances around the unit (
ambient conditions in
12.8 Technical
4. Check the dimensions of the motor cable, DC supply cable, mains fuses, and check the cable connections. Read
Connections,
6.3 EMC-compliant
5. Obey the installation instructions, see
6. Find information on the control connections in
7. If the start-up wizard is active, select the language of the control panel and the application. Accept the selections with the Enter
button. If the start-up wizard is not active, obey the instructions a and b.
A Select the language of the control panel from the Menu M6, page 6.1. For instructions, see
B Select the application from the Menu M6, page 6.2. For instructions, see
8. All parameters have factory default values. To make sure that the AC drive operates correctly, make sure that these group G2.1
parameters have the same data as the nameplate. For more information on the parameters in the list, see the VACON
Application Manual.
•
Nominal voltage of the motor
•
Nominal frequency of the motor
•
Nominal speed of the motor
•
Nominal current of the motor
•
Motor cos phi
9. Obey the commissioning instructions, see
®
The VACON
NX Inverter is ready for operation.
10 | Danfoss A/S © 2019.07
4.1 Checking the
Data.
Installation, and
6.2
Grounding.
6.5 Installing the
Cables.
7.3.2 Control Terminals on
9.2 Commissioning the
Delivery.
2.2 Danger and Warnings
5.2.2 Cooling of FI4 to
OPTA1.
8.7.4 Changing the
Inverter.
Introduction
and
2.3 Cautions and
FI8) and check the
6.1 Cable
8.7.3 Changing the
Language.
Application.
®
All in One
AQ299433367205en-000101 / DPD00908
Notices.
Need help?
Do you have a question about the VACON NX FI6 and is the answer not in the manual?
Questions and answers