Document Revision History - Carrier VAV Zone II Installation And Startup Manual

Table of Contents

Advertisement

Document revision history

Document revision history
Important changes to this document are listed below. Minor changes such as typographical or formatting errors are not
listed.
Date
Topic
8/30/19
Zone Airflow Control
Unit Configuration
1/25/19
Wiring devices to the VAV Zone II's Rnet
port
Specifications
Wiring the VAV Zone II for power > To
12/17/18
wire the controller for power.
Mounting the VAV Zone II > To mount
the controller and actuator
10/30/18
Wiring sensors to the VAV Zone II's
inputs > To wire the T55 sensor to the
controller
Sequence of operation > Temperature
sensors
Wiring equipment to the VAV Zone II's
outputs > Wiring diagram legend
8/28/18
Wiring devices to the VAV Zone II's Rnet
port
Specifications
8/2/18
To wire the CO2 sensor to the
controller
* For internal use only
VAV Zone II Controllers
Installation and Start-up Guide
Change description
Adjusted Damper Actuator travel time
Removed limit on Setpoint Adjustment Range
Removed star configuration from the first paragraph.
Added surge CAUTION to Protection specification.
Added photograph of lifting up the cover.
Added caution stating that you must use the bushing, O-ring, and
screws that are shipped with the VAV Zone II, along with
applicable graphic.
Removed reference to SPT sensors.
Removed SPT sensors.
Removed SPT sensors. Now shown as "Space temp sensor" in
diagrams.
Added TruVu™ ET Display.
Made one topic for overview and wiring for each device.
Removed SPT sensor detail.
Reworded Rnet port specification and added power supplied by
Rnet port.
Added first paragraph to Protection specification.
Diagram for the #33ZCT55CO2 corrected to show wiring to J5 - 3
and 2, not 1 and 2.
104
Code*
C-TS-RD-E
C-TS-CP-E
X-TS-TS-O
X-TS-AK-E-CC
CA-H-RE-E-CC-
JS
CA-H-RE-E-CC-
JS
C-D
C-D
C-D
C-D
X-H-JS-O
C-TS-CP-E-WB
CARRIER CORPORATION ©2019
All rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents