Document Revision History - Carrier Zone Ctrl II Installation And Startup Manual

Table of Contents

Advertisement

Document revision history

Important changes to this document are listed below. Minor changes such as typographical or formatting errors are not
listed.
Date
Topic
1/25/19
Wiring devices to the Zone Ctrl II's
Rnet port
Zone Ctrl II specifications
12/17/18
Wiring the Zone Ctrl II for power > To
wire the controller for power.
Mounting the Zone Ctrl II > To mount
the controller and actuator
10/30/18
Wiring inputs and outputs > Input
wiring specification
8/28/18
Wiring devices to the Zone Ctrl II's
Rnet port
Zone Ctrl II specifications
8/16/18
To set up the Airflow Control
microblock
To use an EquipmentBuilder control
program
* For internal use only
Zone Ctrl II and
VAV Zone II Secondary Duct Installation and Start-up Guide
Error! No text of specified style in document.
Change description
Removed star configuration from the first paragraph.
Added surge CAUTION to Protection specification.
Added photograph of lifting up the cover
Added caution stating that you must use the bushing, O-ring, and
screws that are shipped with the Zone Ctrl II, along with applicable
graphic.
Removed SPT sensors.
Added TruVu™ ET Display.
Made one topic for overview and wiring for each device.
Removed SPT sensor detail.
Reworded Rnet port specification and added power supplied by
Rnet port.
Added first paragraph to Protection specification.
Note added that adjusting the Airflow Control microblock is not
necessary when using EquipmentBuilder control programs.
49
Document revision history
Code*
X-TS-TS-O
X-TS-AK-E-CC
CA-H-RE-E-CC-
JS
CA-H-RE-E-CC-
JS
C-D
C-D
X-H-JS-O
C-CP-AE-E-WB
CARRIER CORPORATION ©2019
All rights reserved

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vav zone ii secondary ductOpn-b3-p-02Opn-sectrm-02

Table of Contents