Connect Cables, Turn On Power, And Verify Connectivity - Cisco AMP PC3000 Hardware Installation Manual

Table of Contents

Advertisement

Connect Cables, Turn on Power, and Verify Connectivity

Figure 30: Inner Rail Release Clip
1
Inner rail release clip
3
Button to unlock rail
Press this button to unlock the rail so you can
pull out the chassis from the rack when
uninstalling or performing maintenance.
Step 5
(Optional) Secure the chassis in the rack more permanently by using the two screws that are provided with the slide rails.
Perform this step if you plan to move the rack with chassis installed. With the chassis fully pushed into the slide rails,
open a hinged slam latch lever on the front of the chassis and insert the screw through the hole that is under the lever.
The screw threads into the static part of the rail on the rack post and prevents the chassis from being pulled out. Repeat
for the opposite slam latch.
Connect Cables, Turn on Power, and Verify Connectivity
After rack mounting the chassis, follow these steps to connect cables, turn on power, and verify connectivity.
Note
AC power supplies have internal grounding and so no additional chassis grounding is required when the
supported AC power cords are used. For more information about supported power cords, see
Specifications, on page
Before you begin
Take note of the following warnings.
Warning
Statement 1009—Laser Radiation
Laser radiation is present when the system is open.
Warning
Statement 1014—Laser Radiation
Laser radiation is present when the system is open and interlocks bypassed.
Cisco AMP PC3000 Hardware Installation Guide
30
2
4
12.
Inner rail attached to the chassis and inserted
into outer rail
Outer rail attached to rack post
Mount the Chassis
Power Cord

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc3000

Table of Contents