30
C
2: I
HAPTER
NSTALLATION
Installation Overview
Figure 3 summarizes the overall installation procedure for the PathBuilder
S330/S310.
Figure 3 General Installation Procedure
Prepare the Site:
Verify clearance around the shelf site
Fabricate and run cabling and wiring
Step 1
Install the optional modules
(optional)
Step 2
Install the unit in the rack
Step 3
Step 4
Connect AC or DC power and
(optionally) the RPS system
Connect I/O cabling and wiring
Connect the management
Step 5
terminal
Need help?
Do you have a question about the SuperStack II PathBuilder S330 and is the answer not in the manual?
Questions and answers