This is the general sequence for commissioning

Requirements
The mechanical and electrical installation of the system must be completed.
● Check the system visually for:
● Switching on the control and startup in "Normal startup":
Sequence overview
Commissioning of the SINUMERIK 828D is carried out in the following steps:
1. Install the software from Toolbox CD onto PG/PC
2. Create communication connection with the control
3. Set the operating software
4. Commission the I/O
5. PLC functions
6. Commission the drive and connect probes
7. Set the NCK machine data
8. Define the maintenance tasks and maintenance intervals
9. Extend the machine with additional devices
10. Tool management
Turning and Milling
Commissioning Manual, 02/2012, 6FC5397-3DP40-3BA0
– Correct mechanical installation with secure electrical connections
– Connection of the power supply
– Connection of shielding and grounding
The control has finished booting when the main screen of the operating software is
displayed.
See Section "Scope of delivery and requirements"
See Section "Communication with the control"
See Section "Settings of the operating software"
See Section "Addressing the I/O modules"
See Function Manual Basic Functions (P4)
See Section "Configuring drive"
See Section "Setting NCK machine data"
See Section "Service Planner"
See Section "Easy Extend"
See Section "Tool management"
Scope of delivery and requirements
1.3 This is the general sequence for commissioning
15

Advertisement

Table of Contents
loading

Table of Contents