The time required for the periodic maintenance is determinated by the quantity of daily work and/or coffee consumption.
N.B. These periodic maintenance operations are not covered by warranty.
▪ Replace group gaskets
▪ Replace diffuser screens
▪ Check brew temperature
▪ Check brew pressure
▪ Check/note water hardness
(Water quality must be within the
range of parameters specified
in the chapter on Installation,
otherwise warranty is voided)
▪ Replace portafilter baskets
▪ Inspect electrical wiring
condition
▪ Inspect boilers safety switches
▪ Inspect electrical wiring
condition
▪ Check the condition of the inside of boilers and if necessary rinse out with a proper cleaning product allowed for food and beverage
appliances.

7. Mandatory Maintenance and Check-up Operations

EVERY THREE/FOUR MONTHS
▪ Inspect solenoid valve (s)
▪ Inspect plumbing for leaks
or clogs
▪ Check all switches for proper
operation
▪ Check filter baskets
EVERY YEAR (in addition to the above)
▪ Remove and clean/inspect
boiler temperature probes
▪ Accurate control of the
tightness at 2,4Nm of each
cable on the terminal block.
EVERY 3 YEARS (in addition to the above)
27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the av Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Av 2Av 1

Table of Contents