TROVIS 6442 (rack-mounting unit for 19inch racks)

3.2. TROVIS 6442 (rack-mounting unit for 19inch racks)
The TROVIS 6442 Process Control Station is a rack-mounting unit designed for mounting in
19inch racks. It has to be installed as follows:
1.
Push the control station along the guiding rails into the corresponding rack unit, making
sure it does not become tilted. Push until the connectors connect.
2.
Secure the process control station to the rack unit by fastening it from the front, using two
screws (see 1, Fig. 4 ).
3
Press one protective nipple (enclosed in the delivery) into each bore made for the screws.
14.5
(0.57)
162.5
(6.40)
190
(7.48)
Fig. 4 ⋅ Dimensions of the 19inch rack-mounting unit

3.3. Opening the controller case

ATTENTION!
!
The case may only be opened by experienced personnel when the power to the process
control station has been cut off!
Re-jumpering (see section 4.) or retrofitting the process control station with an interface board
requires that the case be opened as follows:
1.
With panel-mounting cases, remove small paper labels (see 1, Fig. 3 ) if necessary. With
19inch rack-mounting units, remove the two protective nipples. Unscrew the two screws
located on the front-panel of the case (see Fig. 3 or Fig. 4 , depending on the type of
case).
2.
Withdraw controller section towards the front. Then, proceed as described for the
respective PCB to be modified.
12
1
100
128.5
(3.94)
(5.06)
1
70.5
(14 HP)
(2.77)
Installing the process control stations
1 Screw with
protective nipple

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Trovis 6412Trovis 6442

Table of Contents