Installing The Sneak Fuse Panels - AT&T 75 Wiring Manual

Hide thumbs Also See for 75:
Table of Contents

Advertisement

TABLE 4-H. Auxiliary Lead Appearances at 66-Type Cross-Connect Field
(Contd)
66
Connecting
Block
Terminals
35
Not Connected
36
37
GND
-48
38
GND
39
40
-48
41
GND
42
-48
43
44
45
Not Connected
46
47
48
49
50

Installing the Sneak Fuse Panels

Install the sneak fuse panels as near as possible to the network interface. The sneak fuse
panel has two mounting screw slots. To install the panel, proceed as follows:
1 .
Hold the panel against the mounting surface and mark the upper right and lower
left mounting screw locations and remove panel.
2 .
Drill pilot holes at the marked locations, and partially install the screws.
3 .
Slide the panel onto the mounting screws and tighten.
4 .
Repeat the procedure for each additional sneak fuse panel.
System 75
System 75 XE
Auxiliary
Auxiliary
Connector
Connector
Outputs
Outputs
ACC Power
Not Connected
Ext Alarm A
Ext Alarm B
Not Connected
INADS
INADS
66-TYPE HARDWARE
Z1A
574-5
Emergency
Emergency
Transfer Unit
Transfer Unit
Outputs
Outputs
TK
TK
LC
LC
ST
ST
TC
C0M1
N01
NC2
TK
NC1
C0M2
LC
N02
C0M3
ST
NC3
GRD
PWR
-48V
4-41

Advertisement

Table of Contents
loading

This manual is also suitable for:

75 xe

Table of Contents