Changing Meter Settings

Programming with PanaView
Through PanaView, GC868 users can handle remote programming of
the meter. They can:
Program and change a meter's operating parameters;
Set up, start, and stop logs;
Calibrate and test inputs and outputs;
Clear various files.
To access meter programming:
1. Enter the New Meter Browser option from the "File" menu.
2. Expand the network tree until you reach the desired meter.
3. Then expand the meter tree as shown in Figure C-18 below.
Figure C-18: New Meter Browser with Meter Branch