Moving; Stacking; Fig. 2 Lift Points; Fig. 3 Stacking - Kendro HERAcell 240 Operating Instructions Manual

Co2 incubator with decontamination routine
Table of Contents

Advertisement

®
HERAcell
240 CO
Incubator Operating Instructions
2
3.
Location Requirements
3.4

Moving

NOTE – Lift Points:
When moving the unit, do not lift it by its doors
or other installed components such as the circuit cabi-
net on the rear.
Only lift the unit at the lift points indicated in the figure.
3.5

Stacking

A maximum of two HERAcell
ked. For stacking, you will need the adapter panel
(50068677) which provides a thermal barrier between
the two units.
Stacking elements [2] are provided on the top of the
unit and the top of the adapter panel. The unit feet [1]
on the underside of the unit and the underside of the
adapter panel mate with these elements to ensure a
secure hold for the top unit.
When stacking units, a base stand with a minimum
height of 185 mm should be employed to prevent
contamination of the CO
If the units are mounted on a movable base or cart,
make sure that the base or cart has locking castors so
that they can be locked and pointed forward when the
incubator is put in its operating position, as this offers
the highest degree of safety.
NOTE – Moving Stacked Units:
The stacking elements are not equipped so
that they lock together. Because of this care must
be taken when moving the stacked incubators parti-
cularly. Ramps and uneven surfaces should be avoi-
ded.
Version: 03.2001 / 50065640
®
240 units can be stak-
Incubator.
2
Figure 2 / 3
Fig. 2, Lift points
Fig. 3, Stacking
- 17 -

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Kendro HERAcell 240

Table of Contents