Siemens Simatic PCS7 Function Manual page 43

Process control system maintenance station
Hide thumbs Also See for Siemens Simatic PCS7:
Table of Contents

Advertisement

8. Assign parameters for the PROFIBUS network using the following data:
– Address
– "No DP" mode
9. Select the "Activate data record gateway" check box for the IE/PB Link PN IO link module.
10.Transfer the parameters to the IE/PB Link PN IO link module.
11.Note down the following information:
– The S7 subnet ID and the IP address of the Ethernet network
– The DP master address for the PROFIBUS network
12.Repeat the procedure for any other IE/PB Link PN IO link modules.
Note
Use the same S7 subnet ID for the Ethernet network for any further IE/PB Link PN IO link
modules.
Step 3 - Configure IE/PB Link PN IO link module in the process device network view
1. Configure an Ethernet network in the process device network view.
2. Assign parameters for the Ethernet network with the S7 subnet ID.
3. Configure the IE/PB Link PN IO link module in this Ethernet network.
4. Assign parameters for the IE/PB Link PN IO link module using the following data:
– With the S7 subnet ID
– With the corresponding IP address
– With the corresponding DP master address
5. Repeat the procedure for any other IE/PB Link PN IO link modules.
Additional information
For additional information on this topic, refer to the
Ethernet and PCS 7 Process Control System; SIMATIC PDM manuals.
Maintenance Station
Function Manual, 03/2016, A5E36187641-AA
Configuring the maintenance stations
5.8 Configuring an IE/PB Link PN IO
SIMATIC NET; S7-CPs for Industrial
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents