Siemens SIPROTEC 5 Operation Manual page 30

V7.30 and higher
Hide thumbs Also See for SIPROTEC 5:
Table of Contents

Advertisement

Expanding Devices
2.3 Surface-Mounting Devices with Detached On-Site Operation Panel
Bolt the on-site operation panels of the 2 modules to one another through the contact tab.
²
Check that the bus connection is screwed on at the extreme left of the expansion module.
²
Assembly and Commissioning
Reinstall the plastic screw covers.
²
Use the supplied grounding cable to connect the expansion module with the device and reconnect the
²
device to service ground.
Fit the device back onto the wall.
²
Expand the on-site operation panel with the on-site operation panel of the expansion modules. Make
²
sure that the bus connection is plugged in reliably and that the snap-in springs have engaged.
Bolt the on-site operation panels to one another through the contact tab.
²
Check that the bus connection on the expansion module on the extreme right is covered.
²
Connect all communication lines again.
²
Extend the device configuration in DIGSI and load this configuration to the device.
²
Resume operation of the device.
²
30
SIPROTEC 5, Operation, Manual
C53000-G5040-C003-7, Edition 06.2016

Advertisement

Table of Contents
loading

Table of Contents