3
Take out the provided small copper bars and M8 screws from the UPS package, and
mount them on the four cooper bars that you just removed (see Figure 5-8). For the
UPS's package list, please refer to 2.2 Package Inspection.
Small Copper Bar
(Packed in the
UPS Package)
4
A.
For dual input and top wiring application, follow Figure 5-9 to install the removed four
copper bars (on which the small copper bars have been mounted according to
the designated areas. Please secure the eight nuts tightly.
Cooper Bar
(on Which the Small
Copper Bar Has Been
Mounted According to
B.
For dual input and bottom wiring application, follow Figure 5-10 to install the removed
four copper bars (on which the small copper bars have been mounted according to
3
Modulon DPH Series
Tightening Torque = 150±10kgf·cm
+
M8 Screws
(Packed in the
UPS Package)
(Figure 5-8: Mount the Provided Small Cooper Bar on the Removed Copper Bar)
× 4
)
3
Install the Four
Copper Bars Here
(Figure 5-9: Install the Four Copper Bars and Secure the Eight Nuts_
for Dual Input & Top Wiring Application)
) in the designated areas. Please secure the eight nuts tightly.
+
=
Cooper Bar
(Removed from the
Wiring Terminals
According to
)
2
Tightening Torque = 150±10kgf·cm
A C
T
IN P U
N
L 3
L 2
L 1
A S S
B Y P
T
IN P U
N
L3
L2
L1
Secure the Eight
Nuts Tightly
5-12
Different
Angle
Different
Angle
Install the Four
Copper Bars Here
3
) in
Secure the Eight
Nuts Tightly
Need help?
Do you have a question about the Modulon DPH series and is the answer not in the manual?