Section 2: Installation
2.1
Unpacking
2.1.1
Storage
IMPORTANT
Be sure to read & understand all of the Installation
Instructions before beginning the procedure!
Carefully remove the contents of the shipping carton and check
each item against the packing list before destroying any packing
materials. If there is any shortage or damage, report to the
factory at 1-215-674-1234.
DM330 systems should be stored in their original shipping
containers until ready for installation.
Special Caution:
DM330V – Flexible PVDF systems are shipped in a wooden crate
approx. 4' x 4' (approx. 1m x 1m). The shipping crate protects
the PVDF tubing from bending or damage. After inspection, this
crate should be stored lying flat until ready for installation.
Do not remove the supporting tie wrap fasteners until ready for
installation at the vessel top. Tie wraps should only be removed
in the order indicated on the tie wrap tags.
7
Installation