Ametek DM330 Series Installation And Operating Instructions Manual page 19

Magnetostrictive level system
Table of Contents

Advertisement

2.4.2
Assembly of Stainless Steel Probe
1. Standard SS Float Kit should contain a 2 inch 316 stainless
steel float, spacer and retainer to hold float on to probe. The
standard retainer is a 316 SS "E-Clip". Optionally, if the
probe is to rest on the bottom of a metal tank, an ECTFE
End-Cap may be supplied With either, a spacer is required
to insure SS float is positioned in active area of span.
2. Two people are recommended for assembly of probe, one to
hold the probe and the other to assemble components.
3. Slide compression fitting if it is being used on probe.
4. Slide reducing bushing or flange on to probe.
5. Slide float onto probe. Magnet is located in middle of the
float, so orientation of float does not make any difference.
6. Slide spacer onto probe.
7. Capture all of these parts with E-Clip or ECTFE foot.
At this point, if probe span is to be set outside the
vessel, then go to Section 2-9 Setting Span before
continuing.
Mini
5/8" x ¾" fitting
Connector
1.0"
8.0 "
Stainless Steel Probe Assembly Sequence
13
3/4" x 2" bushing
Span
Figure 2-3
Installation
ECTFE foot
Float
or E-Clip
Spacer
2.0"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dm330v

Table of Contents