Adding Versamax Profinet Scanner Power Supplies - GE PACSystems RX3i User Manual

Profinet io-controller
Hide thumbs Also See for PACSystems RX3i:
Table of Contents

Advertisement

Chapter 3. Configuration
3.7.2

Adding VersaMax PROFINET Scanner Power Supplies

The VersaMax PNS has connectors for either one or two power supplies. If necessary, additional power
supplies can also be located between modules in the remote node.
To configure the one or two power supplies that will be installed directly on the PNS module, right-click on the
Slot 0 icon in the Navigator, then select Change Submodule List. A list of VersaMax power supplies appears.
In the Submodule list for slot 0, expand the Power Supply list and select the desired power supply from the list.
Drag the selected power supply to an available slot in the left pane. Slot 0, Subslot 2 is the leftmost power
supply slot. Slot 0, Subslot 3 is the rightmost power supply slot. (To delete a module after moving it, select the
module on the left and press the keyboard Delete key).
Figure 63: Selecting Power Supply for PNS Rack
Click OK to add the selected module(s) to the configuration. The Navigator shows the added power supply or
power supplies under slot 0.
Figure 64: Power Supplies Displayed in PNS Rack
Adding power supplies to the configuration sets up power supply alarms. Alarms will be triggered if the power
supply is configured but not working, or configured in the wrong subslot. These power supplies have no
configurable parameters, but their power supply and GSDML details can be viewed by double-clicking on a
power supply icon or right-clicking and selecting Configure.
70
PACSystems* RX3i & RSTi-EP PROFINET IO-Controller User Manual
GFK-2571N

Advertisement

Table of Contents
loading

Table of Contents