1-5
Check Every 560 Hours (Once a Month)
1-5-1
Checking the Board Transfer Belts
Check the board transfer belts for the board positioning lifter and board conveyor (both sides)
Tools
Push and pull gage, spanner and Allen wrench
1
Checking for damage to the belt
1E4C-401P
Page 1-36
Required time
3 to 4 minutes
1.
Turn off the power.
2.
Check them (visually) at the edge of
each conveyor, rotating the belt by
hand.
∗ Changing belts after check
"1-9-1 Changing Board Transfer Belts and
Rollers"
1E4C-E-MMA01-A07-00