Redundant Installation; Figure 5-5 Switch Port Locations - Comtech EF Data CSAT-5060 Installation And Operation Manual

C-band transceiver 5 to 25 watt
Table of Contents

Advertisement

5 to 25 Watt Model C-Band Transceiver
Installation
5.5 R
EDUNDANT
5.5.1 A
SSEMBLE
Figure 5-5. Switch
Port Locations
1. Remove all protective tape from switch and keep it clean.
2. Position LNAs and gaskets (11, figure 5-1) on Port 2 and Port 4 of switch (Figure 5-5).
3. Secure each LNA with 8 bolts (7, figure 5-2), lock washers (8) and flat washers (12).
4. Position adapter (3, figure 5-2) and gasket (11) on Port 3 and secure with 10 bolts (7), lock
washers (8), and flat washers (12).
5. Place termination (10, figure 5-2) on threaded part of adapter (3)
Ensure that the OUTPUT flange of the filter is against switch (5).
IMPORTANT
6. Position filter (4, figure 5-2), gasket (11), and Support Bracket (1, figure 5-3) on Port 4 of
switch (Figure 5-5).
7.
Secure with 8 bolts (figure 5-3), lockwashers (2), and flat washers (1), and use 2 bolts
(7, figure 5-2), lockwashers (8), and flat washers (12).
8. Set assembly aside for later installation.
I
NSTALLATION
LNA S
K
, AS/0438
WITCH
IT
5-6
Revision 1
MN/CSAT506025.IOM

Advertisement

Table of Contents
loading

Table of Contents