Line Filter Load Wires
to JP7 Connector
F2
SERIAL COMM & DIGITAL IN
7
Figure 2-2. IQ plus 350 CPU and Power Supply Board, Showing Installed Cables and Cable Ties
2.3.1

Load Cells

To attach cable from a load cell or junction box,
remove connector J1 from the board. The connector
plugs into a header on the board as shown in
Figure 2-6 on page 10.
Wire the load cell cable from the load cell or junction
box to connector J1 as shown in Table 2-1. If using
6-wire load cell cable (with sense wires), remove
jumpers JP1 and JP2 before reinstalling connector J1
(see Figure 2-2). For 4-wire installation, leave
jumpers JP1 and JP2 on.
When connections are complete, reinstall connector
J1 on the board and use two cable ties to secure the
load cell cable to the inside of the enclosure as shown
in Figure 2-2.
Serial Communications Cable
Cable ties
KEYPAD CONNECTOR
F1
JP7
LOCATION OF INSTALLED ANALOG OUTPUT MODULE
4
3
J1
2
1
J4
6
5
4
3
2
1
Cable tie mounts on inside of enclosure top
Load Cell Cable
to J1 Connector
to J4 Connector
J7
J1 Pin
1
2
3
4
5
6
7
For 6-wire load cell connections,
remove jumpers JP1 and JP2.
Table 2-1. J1 Pin Assignments
Setup Switch
Setup Switch Wires
to JP4 Connector
J1
1
2
3
4
5
JP1
J5
6
JP2
7
JP4
SW1
Function
+SIG
–SIG
+SENSE
–SENSE
SHIELD
+EXC
–EXC