Meru Networks AP1000 Installation Manuals page 30

Hide thumbs Also See for AP1000:
Table of Contents

Advertisement

Installing AP1000i
4. Press down on the tab indicated in
5. Push down on the thumbscrews provided on the mounting bracket and clip it to the ceiling bar that
will support the AP.
6. Tighten the screws to ensure that the mechanism stays locked in place.
7. Connect one end of the CAT5 (or greater) Ethernet cable with PoE to the 100/1000 Ethernet
connector shown in
Caution!
mistakenly be plugged into the Console port; if you do this, the AP won't power up.
Figure 15: AP1000i Ethernet Port
8. If you want to lock AP1000i in place, use the supplied locking tool to press the AP1000i locking
mechanism shown in
Figure 16: Optionally lock AP1000i
AP1000 (mounted on ceiling)
9. To unlock AP1000i, press the unlocking mechanism on the opposite side of AP1000i see
18
Meru Access Point Installation Guide
Figure 6
Figure 11
below.
Be sure to connect the Ethernet cable to the Ethernet port. The cable can
Figure
12.
Key
LOCK
and rotate the AP1000i into place.
Figure
10.
© 2013 Meru Networks, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents