Flx Initial Setup - Conair FLX-128 User Manual

Central loading control
Hide thumbs Also See for FLX-128:
Table of Contents

Advertisement

F L X I n i t i a l S e t u p
Prior to operation the FLX requires an initial setup. The setup of the FLX should be com-
pleted as follows:
1
Configure I/O. The I/O should have been configured prior to wiring, but needs to be
verified before operation.
2
Setup Devices.
3
Customize Pump Names.
4
Customize Source Names (when purging is used).
5
Complete PM/Maint Setup.
6
Setup Ratio base and Ratio Startup (when ratio is used).
7
Setup Passwords.
8
Setup Security Levels.
The Setup Wizard
The FLX provides an "Initial Setup Wizard". The wizard directs the user through setup
screens.
All setup screens are accessible from the Setup screen or Advanced Setup screen.
Setup Screen – accessible from the Main Screen Setup button.
o Pump Names – Change names of pumps.
o Source Names – Change names of sources.
o Device Setup – Setup Devices.
o PM / Maint Setup – Setup up PM/Maint set point and PM alarms.
o Ratio System Setup – Setup ratio base and startup counter.
Advanced Setup – accessible from the Setup screen.
o Default Names – Restore default pump, device and source names.
o Clear Setup/Config – Clear setups and/or configurations of FLX.
o Change Password – customize user passwords.
o Security Level – customize the security level for operations/tasks.
o I/O Configure – Configure/verify I/O configurations.
o Setup Wizard – Initial setup wizard for setting up the FLX.
o Network Address – Change the network address of the Operator Interface.
o PLC Connection – Change the network path address of the PLC.
o Remote Alarm – Set network paths for remote alarms.
O p e r a t i o n l
4 - 4 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents