Mounting The Base Unit; M O U N T I N G T H E B A S E U N I T; Mounting Optional Panels And Enclosures - Conair FLX-128 User Manual

Central loading control
Hide thumbs Also See for FLX-128:
Table of Contents

Advertisement

M o u n t i n g t h e B a s e U n i t

The FLX base unit should be mounted on a wall, or other secure vertical surface, at a height
providing easy access and a clear view of the touch screen panel.
1 Bolt the base unit to the mounting surface. Use
the mounting brackets on the base unit enclosures.
2 Connect a ground wire to the base unit enclosure
to ground the base unit cabinet. Follow procedures
outlined by your regional codes and the wiring dia-
grams included with this manual.
M o u n t i n g O p t i o n a l
Pa n e l s a n d E n cl o s u r e s
When mounting optional Remote I/O Panel,
Remote Operator Interface Enclosure(s),
Remote Alarm Enclosure(s) and/or Switch
Enclosure(s), and Expansion Modules, the
following guidelines should be followed:
1 Mount the optional enclosure(s) on a
wall or other secure vertical surface at a height providing easy access and a clear
view of the touch screen panel.
2 Connect the optional hardware to the main FLX via Ethernet. The maximum dis-
tance between the connections is 328 feet {100 meters}. The distance may be extended
if a switch box is used. See electrical drawings for more detail.
3 Using the mounting brackets on the enclosures, bolt the enclosures to the mounting
surface(s).
4 Ground the cabinet by connecting a grounding wire to the enclosure. Follow proce-
dures outlined by your regional electric codes and the wiring diagrams included with this
user guide.
?
i
31 3 3 1
Flexible Material Conveying System Control
I n s t a l l a t i o n l
3 - 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents