Changing Operator Interface Communication Path To Remote I/O Controller - Conair FLX-128 User Manual

Central loading control
Hide thumbs Also See for FLX-128:
Table of Contents

Advertisement

i
NOTE: The operator interface
communication path to con-
troller (PLC) will have to be
changed in all operator inter-
faces.
3 - 2 0
l I n s t a l l a t i o n
C h a n g i n g O p e r a t o r I n t e r fa c e
C o m m u n i c a t i o n Pa t h t o R e m o t e I / O
C o n t r o l l e r ( P L C )
The network address of the Remote I/O Controller (PLC) must be entered into the operator
interface so the operator interface knows where to pull the data from.
1
From the Main screen, press the Setup button.
2
From the Setup screen, press the Advanced
Setup button.
3
Login as admin then press the Remote I/O
Connection button.
4
Follow the proce-
dure on the
screen.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents