Util: Clock; Util: Ledtst (Front Panel Led Test); Util: Relay - Comtech EF Data LBC-4000 Installation And Operation Manual

L-band up/down converter system
Table of Contents

Advertisement

LBC-4000 L-Band Up/Down Converter System
Front Panel Operation
5.2.4.1

UTIL: Clock

UTIL Time/Date:
t=11:59:13 d=12/23/11
 
To edit the time and date settings of the real‐time clock: Use the  [←][→] arrow keys to select 
the digit for edit, and then use the [↑][↓] arrow keys to change that digit: 
 
The  time 
minutes:00‐59 seconds).  
 
The date 
 
Press [ENT] when done. 
5.2.4.2

UTIL: LEDtst (Front Panel LED Test)

 Once LEDtst is selected, the LBC‐4000 runs a diagnostic pass on the front panel LEDs. While the 
test is underway, the following message displays: 
 
Testing LEDs
Please Wait
 
During the test, each converter LED group (CONV A and CONV B) illuminates in sequence: 
 
COLOR
RED
YELLOW
GREEN
5.2.4.3

UTIL: Relay

UTIL Fault Relay Logic:
Normal
 
Use  the  [↑][↓]  arrow  keys  to  select  the  Fault  Relay  Logic  as  Normal  or  Invert,  and  then  press 
[ENT]. 
 
t=
  is  entered  in  military  format  in  the  form  hh:mm:ss  (00‐23  hours:00‐59 
d=
 is entered in mm/dd/yy format (01‐12 month/01‐31 day/00‐99 year). 
LED (CONV A / CONV B)
SUM FLT
MUTE
ON LINE
UP
DN
(▲▼ENT)
5–13
Revision 4
MN/LBC4000.IOM

Advertisement

Table of Contents
loading

Table of Contents