Hardware Installation And Connection; Installation Scenarios; Desktop Installation Procedure - ZyXEL Communications XGS1930-38 User Manual

24/48-port gbe smart manager switch xgs1930 series
Table of Contents

Advertisement

Hardware Installation and

2.1 Installation Scenarios

This chapter shows you how to install and connect the Switch.
The Switch can be placed on a desktop or rack-mounted on a standard EIA rack. Use the rubber feet in
a desktop installation and the brackets in a rack-mounted installation.

2.2 Desktop Installation Procedure

Make sure the Switch is clean and dry.
1
Set the Switch on a smooth, level surface strong enough to support the weight of the Switch and the
2
connected cables. Make sure there is a power outlet nearby.
Make sure there is at least 40 mm of clearance from the bottom to the Switch, and make sure there is
3
enough clearance around the Switch to allow air circulation and the attachment of cables and the
power cord. This is especially important for enclosed rack installations.
Remove the adhesive backing from the rubber feet.
4
Attach the rubber feet to each corner on the bottom of the Switch. These rubber feet help protect the
5
Switch from shock or vibration and ensure space between devices when stacking.
Figure 5 Attaching Rubber Feet
XGS1930 Series User's Guide
25
C
H A P T E R
Connection
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xgs1930-38hpXgs1930-52Xgs1930-52hp

Table of Contents