2.2.2 Example of Indoor Plinth Installation

Inside the equipment room, if BTS cannot be installed on the wall (e.g. structure pole,
hollow wall body, clapboard wall in the simplified equipment room), it can be installed
on the plinth. The position of the plinth should be as close to the wall as possible.
Figure 2-4 shows the indoor plinth installation of BTS with IAFB.
1) Front view
4) IAFB
7) Feeder window
10) BTS3601C PGND cable
13) GPS feeder
Figure 2-4 Installing BTS3601C on the plinth

2.2.3 Example of Concrete Pole Installation

This installation mode applies to such environment as fields, villages, towns, road sides,
etc. to cover the locations like villages and towns. In this case, two poles must be used
in the installation no matter that the BTS to be installed is an omni BTS or a directional
one.
I. Facility requirements
The standard spacing between two poles should be 5m (not less than 3.5m at
l
least), and horizontal diversity distance between two antennae should be 6m (not
less than 5m at least). For an omni BTS, a metal mast should be used to meet the
2) Side view
5) Indoor grounding bar
8) Jumper
11) IAFB grounding bar
14) Wall
2-6
Hardware Installation
2 Installing Cabinet Hardware
3) BTS3601C
6) Support
9) Protection grounding
12) Power cable