I. Description
1)
Planning
You can start to install the BTS only after plans have been made for the installation
positions and cable distribution of all equipment, and relevant support equipment like
supports and masts have been prepared.
2)
Installing major equipment
BTS major equipment refers to the hardware equipment that accomplishes the major
functions of the BTS.
3)
Installing auxiliary equipment
BTS auxiliary equipment refers to the equipment that provides power and functions like
lightning protection and transmission for the major equipment of the BTS.
Start
Plan
Install major
equipment
Install auxiliary
equipment
Install cables
system
feeder system
N
Y
End
Reinstall the
relevant part
2-4
Hardware Installation

2 Installing Cabinet Hardware