1.1 P e r s o n n e l R e q u i r e m e n t s

1.1.1 Basic Requirements

If the project is cooperated with other parties, engineers from cooperation parties shal l
play the key role in installation, engineers from the user shall provide neces sary
assistance, and the engineers from the vendor shall supervise the whole installation
process.
If the project is not cooperated with other parties, engineers from the vendor shall play
the key role in installation, and engineers from the user shall provide assistance.
Engineers from the cooperation party shall be strictly trained and examined by the
vendor. Only after they have mastered the installation and testing methods, and
obtained the qualification certificates, can they implement the installation a n d
commissioning under the supervision of vendor engineers.
Engineers from the user shall receive some training given by the vendor to master the
installation and construction methods prior to the installation.
1.1.2 Requirements for Antenna & Feeder Installat ion Personnel
The antenna & feeder system is normally installed by the antenna & feeder installation
personnel under the supervision of the project supervisor. The number of installation
personnel should be determined according to installation environment.
Project supervisor:
Should be familiar with the materials, tools and methods involved in the antenna &
l
feeder installation.
Should have a strong consciousness of safety, organize the installation personnel
l
and coordinate their work on the principle of "Safety First", especially for the job o n
tower.
Should fill in the engineering data faithfully, e.g., antenna pitch angle, antenna
l
azimuth angle and number of feeders, etc .
Personnel for installation on the tower:
Should obtain the certificates for the relevant work through relevant training;
l

1 Installation Preparations

1 -1
H a r d w a r e I n stallation
1 I n s t a l l a t i o n P r e p a r a t i o n s