Protruding the heatsink
(2) Moving and removing the back installation frames
FR-HC2-H160K to H280K
One installation frame is attached to each of the upper and lower parts
of the converter. Change the position of the rear side installation frame
on the upper and lower sides of the converter to the front side as
shown on the right. When changing the installation frames, make sure
that the installation orientation is correct.
FR-HC2-H400K, H560K
The converter has installation frames: two on the top and the two on
the bottom. As shown on the right, remove the back installation frames
on the top and bottom of the converter.
(3) Installing the converter to the enclosure
Protrude the heatsink of the converter from the installation enclosure, and secure the converter using the top and bottom
installation frames.
Inside the
enclosure
Converter
NOTE
• Protruding area contains a cooling fan, so it cannot be used in the environment where water drops, oil mist, dust and
other substances exist.
• Foreign substances such as screws and dust must be prevented to enter in the converter or the cooling fan section.
22
Enclosure
Exhausted air
The enclosure enclosing FR-HC2-H160K and higher
has a finger guard on its back. The thickness of the
enclosure should be less than 10mm (), and do not
place anything around the finger guard to avoid
contact with the finger guard.
Installation
frame
10∗
Dimension of
Cooling
the outside of
FR-HC2-H160K, H220K
wind
the enclosure
FR-HC2-H280K to H560K
D1
Shift
Shift
Removal
Removal
Enclosure
140
Finger guard
Converter model
Upper
installation
frame
Lower
installation
frame
Upper installation
frame (rear side)
Lower installation
frame (rear side)
D1
185
184

Advertisement