Connecting Load And Auxiliary Power; Figure 5-26. Shield Clamp - Advanced Energy Thyro-PX User Manual

Power controller
Hide thumbs Also See for Thyro-PX:
Table of Contents

Advertisement

®
Advanced Energy
Figure 5‑26. Shield clamp
The following signals are always required for operation of the device: SETPOINT,
PULSE LOCK.
 Important
By default, the unit is configured to require a customer supplied PULSE LOCK
jumper. The unit may be customer configured to not require this jumper.
Complete the following steps to connect each control cable required for your
installation. A plug-in, screw-terminal block is provided for each control connector.
1. Verify that the control cable conductors are sized between 30 AWG and
14 AWG.
2. Prepare the end of the control cable:
a. Strip 50 mm (2") of the cable jacket.
b. Expose the cable shield for connection to the shield clamp.
c. Strip 7 mm (0.28") of insulation from each conductor.
3. Connect each conductor to the plug-in, screw-terminal block.
4. Plug the block into the power controller.
5. Connect the cable shield to the shield clamp.

Connecting Load and Auxiliary Power

    
  DANGER:
RISK OF DEATH OR BODILY INJURY. Disconnect and lockout/tagout all
sources of input power before working on this unit or anything connected to
it.
  DANGER:
RISQUE DE MORT OU DE BLESSURES CORPORELLES. Débrancher et
verrouiller/étiqueter toutes les sources de puissance d'entrée avant de
travailler sur cette unité ou sur tout élément qui y est raccordé.
57010148-00B
Shield clamp
Cable
Exposed shield
Installation, Setup, and Operation
Thyro-PX® Power Controller
5‑23