®
Advanced Energy
you have issues or problems operating your unit after you have followed the first
time operation guidelines.
You can monitor your unit with a system (user-supplied) controller or a Windows
based personal computer running Thyro-Tool Pro PC. To order this software, contact
your AE sales representative.
OPERATING MODES
Full-Wave Switch (TAKT)
In full-switch mode, whole multiples of the mains periods are always switched and
harmonics are minimized.
The mains are switched on/off depending on the prescribed time period.
Ts = switch-on time
Figure 5‑32. TAKT waveform
The start and stop ramp functions can be used in TAKT mode. Ramps are used with
the operation of large single loads to reduce pulse-shaped mains loads and therefore
to reduce voltage variations. The ramps are implemented by applying periods with
phase-angle firing, using the parameters SST and SDN (see the following figure).
Figure 5‑33. Start/stop ramp waveform
57010148-00B
To = full-wave period
Full-wave period 1
Installation, Setup, and Operation
Thyro-PX® Power Controller
Full-wave period 2
®
-
5‑32