Commissioning

Note!
ƒ
ƒ
7.1

Before switching on

Note!
ƒ
ƒ
In order to avoid injury to persons or damage to material assets, check ...
... before switching on the mains voltage:
Check the wiring for completeness, short-circuit and earth fault
ƒ
The "emergency switching off" function of the entire plant
ƒ
The motor circuit configuration (star/delta) must be adapted to the output voltage
ƒ
of the controller
The in-phase connection of the motor
ƒ
The direction of rotation of the incremental encoder (if available)
ƒ
...the setting of the most important drive parameters before controller enable to ensure
the following:
The V/f rated frequency is adapted to the motor circuit configuration!
ƒ
The drive parameters relevant for your application are set correctly!
ƒ
The configuration of the analog and digital inputs and outputs are adapted to the
ƒ
wiring!
EDS84ASC552 EN 10.0
Please observe the general safety instructions ( 12).
Please observe the notes regarding residual hazards ( 18).
Comply with the respective switch-on sequence.
In case of trouble during commissioning, the following supports you:
– The "Diagnostics" chapter
– The online help in the »Engineer«
– The software manual of the prevailing device version
Commissioning
Before switching on
7
243

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8400 stateline c8400 highline c8400 topline c

Table of Contents