6

ASSEMBLY AND COMMISSIONING

6.1

TRAINING ASSEMBLY/COMMISSIONING STAFF

Incorrect installation/operation!
Risk of injury and damage to the device.
A skilled person must check to ensure that the device is in a reliable state after it is installed
and commissioned.
6.2

STORAGE CONDITIONS

Until the point of assembly, the device must be stored in a dry location, free of vibrations
and with a minimum amount of dust. The device must be stored in enclosed rooms.
The air temperature at the storage location must be between -20 °C and +60 °C (-4 °F and
+140 °F).
The relative air humidity at the storage location must be between 10 and 95% (without
condensation).
6.3

INSTALLATION CONDITIONS

The air temperature at the installation site must be in a range between 0 °C and 40 °C;
32 and 132 °F.
The relative air humidity at the installation site must be between 10 and 95% (without
condensation).
6.4

TRANSPORTATION

The pump can be moved on a trolley or manually without lifting equipment or a crane.
ORDER NUMBER DOC2340851
WARNING
The assembly and commissioning staff must have the technical
skills to safely undertake commissioning.
When assembling, commissioning and carrying out all work,
read and follow the operating manuals and safety regulations
for the additionally required system components.