ABB RER620 Technical Manual page 302

Advanced recloser protection and control
Hide thumbs Also See for RER620:
Table of Contents

Advertisement

Section 5
Control functions
296
Figure 152:
Simplified CBB initiation diagram
6initiation lines
INIT_1...
CBB1...CBB2
first two cycle building blocks
The operation of a CBB consists of two parts: initiation and execution. In the initiation
part, the status of the initiation lines is compared to the CBB settings. In order to allow the
initiation at any of the initiation line activation, the corresponding switch in the Init signals
CBB_ parameter must be set to TRUE. In order to block the initiation, the corresponding
switch in the Blk signals CBB_ parameter must be set to TRUE.
If any of the initiation lines set with the Init signals CBB_ parameter is active and no
initiation line causes blocking, the CBB requests for execution.
1MAC309294-MB F
RER620
Technical Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents