Ups Sidecar Operation – Parallel Redundant Configuration; Maintaining The Ups Sidecar; Product Specifications - Eaton UPS Sidecar Powerware 9390 Installation And Operation Manual

Powerware corporation powerware 9390 ups sidecar installation and operation manual
Hide thumbs Also See for UPS Sidecar Powerware 9390:
Table of Contents

Advertisement

4.6
UPS Sidecar Operation – Parallel Redundant Configuration
4.7

Maintaining the UPS Sidecar

4.8

Product Specifications

EATON Powerware
1.
Remove the screw securing the bottom of the UPS Sidecar front panel. Lift up
the panel and remove.
2.
Verify that the UPS Sidecar circuit breakers are set as follows:
Module Output Breaker 1 (MOB 1)
Module Output Breaker 2 (MOB 2)
System Load Breaker (SLB) (if installed)
3.
Reinstall the UPS Sidecar front panel and secure with the screw at the bottom of
the panel.
4.
Start the UPS in Normal mode according to the Multiple Module Parallel
Operation instructions in the operation chapter of the applicable Powerware 9390
installation and operation manual, listed in paragraph 1.5.
The UPS Sidecar maintenance is the same as the UPS. Refer to the applicable
Powerware 9390 installation and operation manual, listed in paragraph 1.5, for
maintenance instructions.
The UPS Sidecar specifications are the same as the UPS. Refer to the applicable
Powerware 9390 installation and operation manual, listed in paragraph 1.5, for product
specifications.
®
9390 UPS Sidecar Installation and Operation Manual
UPS SIDECAR FEATURES, CONTROLS, AND OPERATION
CLOSED
CLOSED
CLOSED
S
164201586 Rev E www.powerware.com
4-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9390 ups sidecarPowerware series9390

Table of Contents