SYSTEM LOAD
BREAKER (SLB) (OP-
TIONAL)
MODULE OUTPUT
BREAKER 1 (MOB 1)
MODULE OUTPUT
BREAKER 2 (MOB 2)
PARALLEL REDUNDANT CONFIGURATION WITH SLB
NOTE 1. Metal shields covering wiring
terminals must be removed to
access terminals.
2. 80/40 must be wired as 80/50.
3. 160/100 must be wired as 160/120.
EATON Powerware
80/40, 80/50, 80/60, 80/80 KVA, 208/208V AND
160/100, 160/120, 160/160 KVA, 480/480V
DESCRIPTION:
DRAWING NO:
REVISION:
®
9390 UPS Sidecar Installation and Operation Manual
NEUTRAL
TERMINAL TB1
AC OUTPUT TO
CRITICAL LOAD
(A, B, C)
(SEE SHEET 34 of 34
FOR DETAILS)
AC INPUT FROM UPM 2
(A, B, C)
(SEE SHEET 33 of 34
FOR DETAILS)
GROUND
POWER TERMINAL LOCATIONS
164201546---6
DATE:
D
S
164201586 Rev E www.powerware.com
INSTALLATION INFORMATION
SHEET:
20 of 34
063006
A-49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9390 ups sidecarPowerware series9390

Table of Contents