Table K. UPS Sidecar 1+1 Parallel Redundant Power Cable Terminations
Terminal Function
AC Input from UPM2 to
MOB 2 (standalone
installation)
AC Output to Critical Load
(without SLB)
AC Output to Critical Load
(with SLB)
Neutral
Ground
Table L. UPS Sidecar 1+1 Parallel Redundant Power Cable Terminations
Terminal Function
AC Input from UPM2 to
MOB 2 (standalone
installation)
AC Output to Critical Load
(without SLB)
AC Output to Critical Load
(with SLB)
Neutral
Ground
13.
Conduit is to be sized to accommodate one neutral conductor the same size as the phase
conductor and one #8 AWG ground conductor. If two neutral conductors or an oversized
neutral conductor are to be installed, size the conduit to accommodate the extra wire or
size. All Powerware 9390 products can accommodate a double-sized neutral.
14.
External UPS Sidecar rectifier and bypass input overcurrent protection is not provided by
this product, but is required by codes. Refer to Table B through Table E for wiring
requirements.
EATON Powerware
120/100, 120/120 kVA 480/480V
Size of Pressure
Function
Termination
Phase A
1 --- #4---350 kcmil
Phase B
1 --- #4---350 kcmil
Phase C
1 --- #4---350 kcmil
Phase A
1 --- #6---500 kcmil
Phase B
1 --- #6---500 kcmil
Phase C
1 --- #6---500 kcmil
Phase A
1 --- #4---350 kcmil
Phase B
1 --- #4---350 kcmil
Phase C
1 --- #4---350 kcmil
Neutral
8 --- #6---250 kcmil
Ground
4 --- #14---1/0
80/40, 80/50, 80/60, 80/80 kVA 208/208V
Size of Pressure
Function
Termination
1 --- 2/0---250 kcmil
Phase A
1 --- 2/0---500 kcmil
1 --- 2/0---250 kcmil
Phase B
1 --- 2/0---500 kcmil
1 --- 2/0---250 kcmil
Phase C
1 --- 2/0---500 kcmil
1 --- 2/0---250 kcmil
Phase A
1 --- 2/0---500 kcmil
1 --- 2/0---250 kcmil
Phase B
1 --- 2/0---500 kcmil
1 --- 2/0---250 kcmil
Phase C
1 --- 2/0---500 kcmil
1 --- 2/0---250 kcmil
Phase A
1 --- 2/0---500 kcmil
1 --- 2/0---250 kcmil
Phase B
1 --- 2/0---500 kcmil
1 --- 2/0---250 kcmil
Phase C
1 --- 2/0---500 kcmil
Neutral
8 --- #6---250 kcmil
Ground
4 --- #14---1/0
DESCRIPTION:
DRAWING NO:
REVISION:
®
9390 UPS Sidecar Installation and Operation Manual
Tightening Torque
Nm (lb in)
20.3 (180)
20.3 (180)
20.3 (180)
56.5 (500)
56.5 (500)
56.5 (500)
20.3 (180)
20.3 (180)
20.3 (180)
42.4 (375)
5.6 (50)
Tightening Torque
Nm (lb in)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
31.1 (275)
42.4 (375)
5.6 (50)
POWER WIRING INSTALLATION NOTES
164201546---4
DATE:
E
S
164201586 Rev E www.powerware.com
INSTALLATION INFORMATION
Type
Screw
3/16" Hex
3/16" Hex
3/16" Hex
1/2 Hex
1/2 Hex
1/2 Hex
3/16" Hex
3/16" Hex
3/16" Hex
5/16" Hex
Slotted
Type
Screw
5/16" Hex
3/8" Hex
5/16" Hex
3/8" Hex
5/16" Hex
3/8" Hex
5/16" Hex
3/8" Hex
5/16" Hex
3/8" Hex
5/16" Hex
3/8" Hex
5/16" Hex
3/8" Hex
5/16" Hex
3/8" Hex
5/16" Hex
3/8" Hex
5/16" Hex
Slotted
SHEET:
7 of 10
092107
A-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9390 ups sidecarPowerware series9390

Table of Contents