Eaton UPS Sidecar Powerware 9390 Installation And Operation Manual page 96

Powerware corporation powerware 9390 ups sidecar installation and operation manual
Hide thumbs Also See for UPS Sidecar Powerware 9390:
Table of Contents

Advertisement

INSTALLATION INFORMATION
TERMINAL TB1
NOTE 1. Metal shields covering wiring
terminals must be removed to
access terminals.
2. 80/40 must be wired as 80/50.
A-46
EATON Powerware
SYSTEM LOAD
BREAKER 1 (SLB 1)
MODULE OUTPUT
BREAKER 1 (MOB 1)
MODULE OUTPUT
BREAKER 2 (MOB 2)
80/40, 80/50, 80/60, 80/80 KVA, 480/480V
PARALLEL REDUNDANT CONFIGURATION W/SLB
®
9390 UPS Sidecar Installation and Operation Manual
NEUTRAL
AC OUTPUT TO CRITICAL
LOAD WITH SLB
(A, B, C)
(SEE SHEET 30 of 34
FOR DETAILS)
AC INPUT FROM UPM 2
(A, B, C)
(SEE SHEET 31 of 34
FOR DETAILS)
GROUND
DESCRIPTION:
POWER TERMINAL LOCATIONS
DRAWING NO:
164201546---6
REVISION:
E
S
164201586 Rev E www.powerware.com
SHEET:
17 of 34
DATE:
061507

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9390 ups sidecarPowerware series9390

Table of Contents