Eaton UPS Sidecar Powerware 9390 Installation And Operation Manual page 70

Powerware corporation powerware 9390 ups sidecar installation and operation manual
Hide thumbs Also See for UPS Sidecar Powerware 9390:
Table of Contents

Advertisement

INSTALLATION INFORMATION
Read and understand the following notes while planning and performing the installation:
1.
Refer to national and local electrical codes for acceptable external wiring practices.
2.
Material and labor for external wiring requirements are to be provided by designated
personnel.
3.
For external input wiring, use 90°C copper wire. See the appropriate column in Table B
through Table E. Wire sizes are based on using the specified breakers.
4.
Wire ampacities are chosen from Table 310---16 of the NEC. Input wire is 90°C
specification.
5.
If a Bypass Input Breaker is not installed, a minimum of two separate feeds with upstream
feeder breakers, or one feed with two upstream feeder breakers, must be provided: one
for the UPS and one for the UPS Sidecar bypass input. DO NOT use one feed or a
single-feeder breaker to supply both the UPS and Sidecar.
6.
Refer to Section I of this manual for installation instructions.
7.
Refer to the applicable Powerware 9390 installation and operation manual, listed in
paragraph 1.5, for UPS cabinet wiring requirements, and conduit and terminal locations.
8.
Refer to the applicable Powerware 9390 installation and operation manual, listed in
paragraph 1.5, for parallel system power and control wiring requirements.
9.
Terminals are UL and CSA rated at 90˚C. Refer to Table F through Table K for power cable
terminations. Drawing 164201546---6, starting on page A---30, shows the location of the
power cable terminals inside the UPS Sidecar cabinet.
10.
Per NEC article 300-20(a), all three
Neutral and ground must be run in the same conduit as the phase conductors.
11.
If input or output neutrals are required for Maintenance Bypass configurations, wire the
neutrals to the neutral terminals located inside the UPS cabinet. For Maintenance Bypass
configurations, wire grounds to the ground terminals located inside the UPS cabinet.
12.
40/20 kVA and 40/30 kVA parallel systems must be wired for 40/40 kVA.
A-20
EATON Powerware
Specified wiring and the MOB and SLB breakers for the UPS Sidecar are
rated for parallel redundant service only. DO NOT use as a parallel
capacity system.
Parallel system wiring length should be in accordance with the parallel
drawings found in the appendix of the applicable Powerware 9390
installation and operation manual, listed in paragraph 1.5. Correct wire
length ensures approximate equal current sharing when in Static bypass
mode.
®
9390 UPS Sidecar Installation and Operation Manual
C A U T I O N
C A U T I O N
phase conductors must be run in the same conduit.
-
DESCRIPTION:
POWER WIRING INSTALLATION NOTES
DRAWING NO:
164201546---4
REVISION:
C
S
164201586 Rev E www.powerware.com
SHEET:
4 of 10
DATE:
061507

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9390 ups sidecarPowerware series9390

Table of Contents