Setup - KERN FES 33K0.1 IPM Operating Instruction

Fes series; fej series industrial scale
Table of Contents

Advertisement

6.4 Setup

1. Level balance with foot screws until the air bubble of the water balance is in
the prescribed circle.
2. Remove weighing plate
3. Release the knobs on the display holder almost completely
4. Suspend the display holder on the cable box from above
5. Turn in knobs completely in order to fix them
6. Draw the cable into the cable box, bend and store it, and let 15 cm remain
outside.
FES/FEJ-BA-e-1132
Knobs
Cable box
Bubble level
Foot screws
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents