GE T60 Instruction Manual page 307

Ur series transformer protection system
Hide thumbs Also See for T60:
Table of Contents

Advertisement

5 SETTINGS
Table 5–20: T60 FLEXLOGIC OPERANDS (Sheet 3 of 9)
OPERAND TYPE
OPERAND SYNTAX
ELEMENT:
GND DIST Z1 PKP
Ground distance
GND DIST Z1 OP
GND DIST Z1 OP A
GND DIST Z1 OP B
GND DIST Z1 OP C
GND DIST Z1 PKP A
GND DIST Z1 PKP B
GND DIST Z1 PKP C
GND DIST Z1 SUPN IN
GND DIST Z1 DPO A
GND DIST Z1 DPO B
GND DIST Z1 DPO C
GND DIST Z1 DIR SUPN
GND DIST Z2 to 5
ELEMENT:
GROUND IOC1 PKP
Ground
GROUND IOC1 OP
instantaneous
GROUND IOC1 DPO
overcurrent
GROUND IOC2 to 12
ELEMENT:
GROUND TOC1 PKP
Ground time
GROUND TOC1 OP
overcurrent
GROUND TOC1 DPO
GROUND TOC2 to 6
ELEMENT
LATCH 1 ON
Non-volatile latches
LATCH 1 OFF
LATCH 2 to 16
ELEMENT:
LOAD ENCHR PKP
Load encroachment
LOAD ENCHR OP
LOAD ENCHR DPO
ELEMENT:
NEUTRAL IOC1 PKP
Neutral
NEUTRAL IOC1 OP
instantaneous
NEUTRAL IOC1 DPO
overcurrent
NEUTRAL IOC2 to
ELEMENT:
NEUTRAL OV1 PKP
Neutral overvoltage
NEUTRAL OV1 DPO
NEUTRAL OV1 OP
NEUTRAL OV2 to 3
ELEMENT:
NEUTRAL TOC1 PKP
Neutral time
NEUTRAL TOC1 OP
overcurrent
NEUTRAL TOC1 DPO
NEUTRAL TOC2 to 6
ELEMENT:
NTRL DIR OC1 FWD
Neutral directional
NTRL DIR OC1 REV
overcurrent
ELEMENT:
OVERFREQ 1 PKP
Overfrequency
OVERFREQ 1 OP
OVERFREQ 1 DPO
OVERFREQ 2 to 4
ELEMENT:
PDC NETWORK CNTRL 1
Synchrophasor
PDC NETWORK CNTRL 2
phasor data
concentrator
PDC NETWORK CNTRL 16
ELEMENT:
PH DIR1 BLK A
Phase directional
PH DIR1 BLK B
overcurrent
PH DIR1 BLK C
PH DIR1 BLK
GE Multilin
OPERAND DESCRIPTION
Ground distance zone 1 has picked up
Ground distance zone 1 has operated
Ground distance zone 1 phase A has operated
Ground distance zone 1 phase B has operated
Ground distance zone 1 phase C has operated
Ground distance zone 1 phase A has picked up
Ground distance zone 1 phase B has picked up
Ground distance zone 1 phase C has picked up
Ground distance zone 1 neutral is supervising
Ground distance zone 1 phase A has dropped out
Ground distance zone 1 phase B has dropped out
Ground distance zone 1 phase C has dropped out
Ground distance zone 1 directional is supervising
Same set of operands as shown for GND DIST Z1
Ground instantaneous overcurrent 1 has picked up
Ground instantaneous overcurrent 1 has operated
Ground instantaneous overcurrent 1 has dropped out
Same set of operands as shown for GROUND IOC 1
Ground time overcurrent 1 has picked up
Ground time overcurrent 1 has operated
Ground time overcurrent 1 has dropped out
Same set of operands as shown for GROUND TOC1
Non-volatile latch 1 is ON (Logic = 1)
Non-volatile latch 1 is OFF (Logic = 0)
Same set of operands as shown for LATCH 1
Load encroachment has picked up
Load encroachment has operated
Load encroachment has dropped out
Neutral instantaneous overcurrent 1 has picked up
Neutral instantaneous overcurrent 1 has operated
Neutral instantaneous overcurrent 1 has dropped out
Same set of operands as shown for NEUTRAL IOC1
Neutral overvoltage element 1 has picked up
Neutral overvoltage element 1 has dropped out
Neutral overvoltage element 1 has operated
Same set of operands as shown for NEUTRAL OV1
Neutral time overcurrent 1 has picked up
Neutral time overcurrent 1 has operated
Neutral time overcurrent 1 has dropped out
Same set of operands as shown for NEUTRAL TOC1
Neutral directional overcurrent 1 forward has operated
Neutral directional overcurrent 1 reverse has operated
Overfrequency 1 has picked up
Overfrequency 1 has operated
Overfrequency 1 has dropped out
Same set of operands as shown for OVERFREQ 1
Phasor data concentrator asserts control bit 1 as received via the network
Phasor data concentrator asserts control bit 2 as received via the network
Phasor data concentrator asserts control bit 16 as received via the network
Phase A directional 1 block
Phase B directional 1 block
Phase C directional 1 block
Phase directional 1 block
T60 Transformer Protection System
5.5 FLEXLOGIC
5
5-161

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents