Section 6
Testing IED operation
6.7
Testing protection functionality
Each protection function must be tested individually by secondary injection.
•
Verify operating levels (trip) and timers.
•
Verify alarm and blocking signals.
•
Use the disturbance handling tool in PCM600 to evaluate that the protection function has
received the correct data and responded correctly (signaling and timing).
•
Use the event viewer tool in PCM600 to check that only expected events have occurred.
38
© Copyright 2011 ABB. All rights reserved
1MRK 502 035-UEN A
GUID-125B6F28-D3E5-4535-9CD6-6C056B79F496 v1
Generator protection REG650
Commissioning manual