Mounting Instructions

Mounting PTFE Rod Antenna, FF Flange
wiring access
cover
process
device tag
vessel
minimum diameter
2" / DIN 50
Notes:
• The integral process seal MUST rest on the customer flange. See the detail above,
showing a correctly mounted instrument.
• The straight/taper transition of the rod should extend past the nozzle/vessel
opening. Add extensions as required
Rod Extension Requirements
* Refer to the
7ML19985HP01
SITRANS LR 200 (PROFIBUS PA) – INSTRUCTION MANUAL
1/2" NPT
or M20 x 1.5
cable entry
locking ring
customer-flanged
nozzle to suit
customer flange
integral process seal
nozzle/vessel juncture
straight/taper transition
.
table on page 54.
Correctly Mounted
Instrument
Page 53